Wallbridge Drilling at Fenelon Tabasco Zone Intersects Additional High-Grade Gold Mineralization

In This Article:

Wallbridge Mining Company Limited
Wallbridge Mining Company Limited

TORONTO, Dec. 16, 2024 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) today announced that it has received the final assay results from its 1,303 metre Phase 2 drilling program completed in September 2024 at its 100% owned Fenelon Gold Project (“Fenelon”).

The Phase 2 program comprised four targeted infill holes drilled within an approximate 150 metre by 250 metre area to provide greater definition of gold resources within the upper levels of the high-grade Tabasco zone. Significant highlights include:

  • 5.68 g/t Au over 1.5 metres in drill hole FA-24-581

  • 3.93 g/t Au over 2.5 metres, 14.66 g/t Au over 1.5 metres in drill hole FA-24-582

  • 7.03 g/t Au over 0.5 metres, 2.70 g/t Au over 3.0 metres in drill hole FA-24-583

  • 5.92 g/t Au over 2.7 metres in drill hole FA-24-584

“We’re pleased to announce our final drill results for 2024. The grades returned from these latest four holes provide further confirmation of the position and extent of the principal structures that extend upward from the high-grade core of the Fenelon gold resource,” commented Brian W. Penny, Wallbridge Chief Executive Officer. “We look forward to releasing the results of an updated Preliminary Economic Assessment at Fenelon in the first quarter of 2025 and will continue to provide regular updates to the market on our corporate activities,” concluded Mr. Penny.

Earlier this year and during 2023, Wallbridge released a series of results from delineation and infill drilling completed at Fenelon subsequent to the announcement of the 2023 mineral resource estimate (see Wallbridge news releases dated May 22, 2024, February 7, 2024, June 6, 2023, March 6, 2023, January 17, 2023, and Amended and Re-stated: NI 43-101 Technical Report dated December 29, 2023).

Links to a drill hole location map and cross-sections for the drill holes reported in this news release are provided here: Fenelon Gold Project: Q2 2024 Plan View Map & Cross-Sections

Additional details from the recently completed drilling are provided in the summary table below:

Wallbridge Fenelon Gold Project: 2024 Phase 2 Drill Assay Highlights

Drill Hole

 

From
(m)

To
(m)

Length
(m)

Au
(g/t)

Zone/Corridor

FA-24-581

 

235.5

237.0

1.5

5.68

Tabasco

FA-24-582

 

143.5

146.0

2.5

3.93

Tabasco

Including

 

143.5

144.5

1.0

8.46

 

 

 

144.5

145.0

0.5

0.10

 

 

 

145.0

146.0

1.0

1.17

 

 

*

248.0

249.5

1.5

14.66

Tabasco

Including

 

248.0

248.5

0.5

4.84

 

 

*

248.5

249.5

1.0

19.57

 

 

 

301.0

309.0

8.0

2.91

Tabasco

Including

 

301.0

302.5

1.5

4.96

 

 

 

302.5

304.0

1.5

0.05

 

FA-24-582 (cont’d)

 

304.0

305.0

1.0

11.95

 

 

 

305.0

305.5

0.5

0.09

 

 

 

305.5

307.0

1.5

1.69

 

 

 

307.0

308.0

1.0

0.02

 

 

 

308.0

309.0

1.0

1.20

 

FA-24-583

 

121.5

122.0

0.5

7.03

Tabasco

 

 

266.5

269.5

3.0

2.70

Tabasco

FA-24-584

 

219.0

221.7

2.7

5.92

Tabasco

Including

 

219.0

220.0

1.0

0.52

 

 

 

220.0

221.0

1.0

14.91

 

 

 

221.0

221.7

0.7

0.50

 

Notes

 

 

 

 

 

 

1 Highlighted assay composites have been selected based on a Metal Factor >5 gm*mtrs and/or includes a result >5 g/t (MF = Au g/t * Interval length).

2 Asterisk * denotes visible gold (VG) observed in drill core.

3 True widths are estimated to be 60-90% of the reported core length intervals.


Links to tables with complete summary assay results and drillhole location information are provided here: Fenelon Gold Project: Drill Assay Summary and Location Information Dec 2024.