TORONTO, Dec. 19, 2024 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX:WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) today reports the results of its 2024 metallurgical testing program for its Martiniere Gold Project (“Martiniere”). Test work completed by SGS Lakefield Research Ltd. (“SGS Lakefield”) indicates gold recoveries of up to 84.8% can be achieved using conventional and proven technologies.

The 2024 metallurgical testing program was done as an initial test to evaluate potential gold recoveries for various grind sizes and processing technologies applied to a representative sample composite collected from five holes drilled along the Bug Lake zone at Martiniere (see map below). Material collected was tested for its amenability to gravity separation, flotation, and cyanidation under varying grind sizes and conditions. Testing shows gold recoveries up to 84.8% can be achieved using a combination of gravity, flotation, regrind and cyanidation of sulfide concentrate and flotation tailings (see table below).

“These initial metallurgical test results are positive and achieve two important objectives,” stated Brian Penny, Wallbridge Chief Executive Officer. “First, they demonstrate that good gold recoveries can be attained from Bug Lake mineralization. Second, they indicate these recoveries can be achieved using well-established time-tested mineral processing technologies. Moreover, the information generated by this year’s metallurgical testing program at Martiniere provides a solid foundation for the design of future metallurgical and related technical studies as we continue to explore the deposit and advance the project.”

Metallurgical test work results:

The grade of the composite sample averaged 3.21 g/t Au. A gold recovery of 18.5% was achieved by gravity separation for material with a P80 grind size of 150 microns (“μm”). Flotation testing conducted on material with a P80 grind size of 83 μm achieved a gold recovery of 89.5%. Cyanidation (‘CN’) testing done on flotation tailings material yielded a maximum gold recovery of 68.2%. Cyanidation of sulfide concentrate re-ground to P80 at 29 μm and 16 μm returned gold recoveries of 62.0% and 82.9% respectively.

Overall, an average gold recovery of 84.8% was achieved after a 48 hour processing cycle involving a combination of gravity recovery, sulfide flotation, regrind of sulfide concentrate to P80 at 16 μm, and cyanidation of sulfide concentrate and residual flotation tailings.

Wallbridge Martiniere Gold Project: 2024 Metallurgical Test Summary

Tests

 

Gold Recovery %

 

Gravity
Separation

Cyanidation of Sulfide Flotation Concentrate and Flotation Tails

Time (hours)

 

t = 0

6 Hr

24 Hr

36 Hr

48 Hr

Combined Tail – Concentrate @ 29 μm

 

18.5%

71.0

73.2

73.0

73.6

Combined Tail – Concentrate @ 16μm

 

18.5%

84.4

84.4

85.3

84.8

CN Flotation Concentrate @ 29 μm

 

18.5%

66.4

67.3

67.2

67.8

CN Flotation Concentrate @ 16 μm

 

18.5%

79.7

78.6

79.5

79.0

CN Flotation Tails @ 83 μm

 

18.5%

23.1

24.3

24.3

24.3

 

 

 

 

 

 

 

2024 Metallurgical Composite Sample Locations
2024 Metallurgical Composite Sample Locations


2024 Metallurgical Composite Sample Locations