2025 Drilling Programme Commences on the BAM Gold Deposit

In This Article:

LONDON, March 17, 2025 /CNW/ - Landore Resources Limited (AIM: LND) ("Landore Resources" or the "Company") is pleased to announce the commencement of the 2025 drilling programme on its flagship BAM Gold Deposit ("BAM Gold" or "BAM") at the Junior Lake property, Ontario, Canada.

Highlights:

  • 3,500-metre diamond drilling programme has commenced on BAM Gold, which is focused on providing greater clarity on the structure of the orebody, increasing overall confidence in the grade, size and continuity of the resource, as well as testing the considerable down-dip potential.

  • The programme will seek to upgrade BAM's Inferred resources to the Indicated category and test the considerable higher-grade mineralisation potential down-dip. The drilling results will be used to update BAM's existing Mineral Resource Estimate ("MRE"), expected to be received in Q3 2025. Additional infill sampling of existing BAM drill core, aimed to further inform the deposit mineralisation model, is scheduled to be completed concurrently with the drilling.

  • Results from the drill programme and additional infill drill core sampling, together with other studies including the BAM structural assessment completed by TECT Geological Consultancy, will be utilised to update the existing MRE and then subsequently to develop a Pre-Feasibility Study ('PFS') in 2026.

Commenting on today's update, Landore Resources' CEO, Alexander Shaw, said:
"The commencement of our 3,500m drill programme is the first of several exciting developments anticipated for our flagship BAM Gold project in Ontario this year. The drill programme will help inform the preparation of an upgraded mineral resource estimate later this year and, subsequently, the development of a pre-feasibility study in 2026. The fast tracking of adding further value to this highly scalable gold asset, located in a proven mining district, with significant upside potential, underpins our strategy of seeking to deliver strong future returns to our stakeholders as a whole. We look forward to providing further updates as our exploration work progresses."

BAM Drilling

The majority of the 3,500-metre resource drilling campaign at the BAM Gold project will focus on the eastern portion of the deposit, seeking to upgrade Inferred resources to the Indicated category, as well as testing the considerable higher-grade potential down-dip within the central portion of the eastern pit area. Drilling to test both shallow and deep mineralisation zones will also be completed on the western portion of the deposit. The results from this drill programme will be used to update the existing BAM Gold Mineral Resource Estimate ("MRE"), anticipated to be received in Q3 2025.