Entrée Announces Drill Results from Hugo North Extension and Heruga Deposits

In This Article:

Entree Resources Ltd
Entree Resources Ltd

VANCOUVER, British Columbia, Feb. 27, 2025 (GLOBE NEWSWIRE) -- Entrée Resources Ltd. (TSX:ETG; OTCQB:ERLFF – the “Company” or “Entrée”) is pleased to provide analytical results for eleven underground diamond drill holes (“DDH”) completed in 2022 – 2024 at the Hugo North Extension (“HNE”) deposit on the Entrée/Oyu Tolgoi joint venture property (the “Entrée/Oyu Tolgoi JV Property”) in Mongolia. Analytical results are also provided for one DDH completed at the western edge of the Heruga copper-gold-molybdenum deposit and five DDH from the 2024 regional drilling campaign.

One underground DDH from the 2023 drilling program at HNE, two surface DDH and eight underground DDH from the 2024 drilling program at HNE, and two 2024 regional DDH are pending analytical results. These results will be reported as they become available from the Company’s joint venture partner Oyu Tolgoi LLC (“OTLLC”).

DRILL HOLE HIGHLIGHTS

HNE Underground Drill Holes

  • UGD 578: 164 m grading 1.61% copper equivalent (“CuEq”), including 72 metres (“m”) grading 2.89% CuEq.

  • UGD 807C: 465.5 m grading 1.51% CuEq, including 188.5 m grading 2.50% CuEq.

  • UGD 815: 224 m grading 2.05% CuEq.

  • UGD 852: 351.2 m grading 1.53% CuEq, including 104 m grading 2.65% CuEq.

Heruga Drill Hole

  • EJD0099: 409.9 m grading 0.58% CuEq, including 230 m grading 0.79% CuEq.

    Note: Copper equivalent for HNE and Heruga are defined below Table 1, where full details on the drill hole assay intervals are also found.

Stephen Scott, Entrée’s President and CEO commented, “We are very pleased to be able to report additional results from drilling completed in 2022, 2023, and 2024. UGD578, which was drilled in 2022 for geotechnical purposes and not assayed until 2024, has returned outstanding results. The results from the 2023 underground drilling reported in this update are some of the best we’ve received since HNE deposit drilling restarted in 2022. We are also excited to see very promising results from the first hole drilled at the Heruga deposit in more than 12 years. This hole is further west than any previous drilling and demonstrates that more work is needed to fully understand the deposit’s true potential”.

HNE DRILLING RESULTS

The new drill hole analytical results from the HNE deposit include eleven underground DDH completed during 2022, 2023, and 2024 (Table 1). This includes drill hole UGD 578 from 2022 that was previously classified by OTLLC as a geotechnical hole that would not be analyzed. Four underground DDH from 2023 and six underground DDH from 2024 are also reported. These holes were all collared from existing infrastructure on the Oyu Tolgoi mining licence and drilled to the north or northwest onto the Entrée/Oyu Tolgoi JV Property, targeting mineralization within the existing footprint of the HNE deposit.