Kobo Resources Completes 10,663 m Diamond Drill Program at Kossou; Reports Additional High-Grade Gold Intercepts of 10.0 m at 3.20 g/t Au, incl. 3.0 m at 9.13 g/t Au and 4.0 m at 5.10 g/t Au

In This Article:

Figure 1: Road Cut Zone Diamond Drill Results and Collar Location Map (Graphic: Business Wire)
Figure 1: Road Cut Zone Diamond Drill Results and Collar Location Map (Graphic: Business Wire)
Figure 2: Road Cut Zone – Section RCZ650 Simplified Geological Cross-Section (Graphic: Business Wire)
Figure 2: Road Cut Zone – Section RCZ650 Simplified Geological Cross-Section (Graphic: Business Wire)
Figure 3: Shadow Zone Diamond Drill Results and Collar Location Map (Graphic: Business Wire)
Figure 3: Shadow Zone Diamond Drill Results and Collar Location Map (Graphic: Business Wire)
  • Diamond drilling concludes at 10,663 m across 51 holes, refining priority gold targets for future exploration

  • Final assay results include high-grade gold intercepts of 10.0 m at 3.20 g/t Au, incl. 3.0 m at 9.13 g/t Au and 4.0 m at 5.10 g/t Au at the Road Cut Zone

  • Geological and structural assessment underway to finalize plans for the next phase of drilling, expected to begin in Q2 2025

QUEBEC CITY, March 03, 2025--(BUSINESS WIRE)--Kobo Resources Inc. ("Kobo" or the "Company") (TSX.V: KRI) has successfully completed its 10,663 metre ("m") diamond drill program across 51 drill holes at its 100%-owned Kossou Gold Project ("Kossou") in Côte d’Ivoire. Final drill results from the program continue to highlight strong gold mineralization at key targets, including additional high-grade intercepts at the Road Cut Zone ("RCZ") of 10.0 m at 3.20 g/t Au, including 3.0 m at 9.13 g/t Au, and 4.0 m at 5.10 g/t Au.

Additionally, an initial drill hole at the Shadow Zone confirmed mineralization associated with artisanal mining activities, returning 1.0 m at 8.97 g/t Au, though gold-bearing structures appear localized, warranting further assessment to determine the zone’s broader potential

With the successful completion of this phase, the Company is now undertaking a strategic review of its results to refine the next stage of exploration at Kossou. The Company is evaluating follow-up drilling at high-priority targets, with the next drill program expected to commence in Q2 2025.

Diamond Drill Results – Highlights:

Road Cut Zone:

  • KDD0065

    • 7.0 m at 1.43 g/t Au from 148.0 m

  • KDD0066

    • 4.0 m at 5.10 g/t Au from 16.0 m, including 1.0 m at 15.60 g/t Au

    • 10.0 m at 3.20 g/t Au from 70 m, including 3.0 m at 9.13 g/t Au

  • KDD0067

    • 13.0 m at 1.11 g/t Au from 78.0 m, including 6.0 m at 1.49 g/t Au from 80.0 m

  • KDD0068

    • 8.0 m at 1.50 g/t Au from 92.0 m

  • KDD0070

    • 5.20 m at 3.42 g/t Au from 44.0 m, including 1.0 m at 11.70 g/t Au from 48.2 g/t Au

Shadow Zone:

  • KDD0074

    • 1.0 m at 8.97 g/t Au from 45.4 m

Edward Gosselin, CEO and Director of Kobo commented: "Successfully completing our 10,000 m drill program marks a key milestone in our exploration efforts at Kossou. This program has delivered strong gold intercepts, particularly at the Jagger and Road Cut Zones, where we continue to refine our understanding of the mineralization. While results at the Road Cut and Kadie Zones have been encouraging, further work is required to fully define the scale and continuity of these targets. With drilling now complete across multiple priority gold targets, we are now entering an important phase of analysis to refine our structural model and optimize the next drill program, set to begin in Q2 2025. We anticipate significantly expanding our drilling efforts in the months ahead, with the goal of positioning ourselves for a potential maiden Mineral Resource Estimate by early 2026."