Talisker Initiates Lateral Development on Alhambra Vein at the Bralorne Gold Project

In This Article:

Talisker Resources Ltd.
Talisker Resources Ltd.

TORONTO, April 09, 2025 (GLOBE NEWSWIRE) -- Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX: TSK, OTCQX: TSKFF) is pleased to announce it has begun lateral development on the Alhambra Vein on the 1105 level at the Bralorne Gold Project. To date, a total of 107.1 metres of 3X3 metre development has been completed at the Mustang Mine including 2.2 metres in the mineralized Alhambra Vein. Vein access is currently underway on four levels with 11.4 metres already completed on the 1060 level, 34 metres completed on the 1075 level, 26.4 metres completed on the 1105 level and 9.3 metres completed on the 1120 level. Additional development will begin shortly on the 1090 level to provide a fifth level of access to mineralized material. Talisker expects to be extracting material from its first stope towards the end of May or early June.

Terry Harbort, CEO of Talisker stated, “We are pleased to have reached the Alhambra Vein ahead of schedule and excited to be blasting in mineralized vein material. I offer my congratulations to the operational team on an excellent job and look forward to continued progress at Mustang.”

For further information, please contact:

Terry Harbort
President and CEO
terry.harbort@taliskerresources.com
+1 416 357 0227

About Talisker Resources Ltd.

Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is currently transitioning into underground production at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an advanced stage project with significant exploration potential from an historical high-grade producing gold mine and the Spences Bridge Project where the Company has a significant landholding in the emerging Spences Bridge Gold Belt, and several other early-stage Greenfields projects.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate.