Vista Gold Continues to Encounter High Grade Gold Intercepts in Final Holes of 2024 Drilling Program

In This Article:

Figure 1: Plan view of the Mt Todd terrain showing Phase 2 drill hole locations with respective orientation, highlighting the holes announced in this release. (Graphic: Business Wire)
Figure 1: Plan view of the Mt Todd terrain showing Phase 2 drill hole locations with respective orientation, highlighting the holes announced in this release. (Graphic: Business Wire)
Figure 2: Plan view of the Phase 2 drill holes, including holes in this release, in relation to the current reserves pit design, resource shell, and the wireframe representing the SXL. (Graphic: Business Wire)
Figure 2: Plan view of the Phase 2 drill holes, including holes in this release, in relation to the current reserves pit design, resource shell, and the wireframe representing the SXL. (Graphic: Business Wire)
Figure 3: Cross section (8435850N) of the center portion of the SXL, illustrating drill holes VB24-031 and VB24-032 within the current mineral resource shell from the 2024 Feasibility Study featuring blocks with a cut-off grade above 0.40 g Au/t. (Graphic: Business Wire)
Figure 3: Cross section (8435850N) of the center portion of the SXL, illustrating drill holes VB24-031 and VB24-032 within the current mineral resource shell from the 2024 Feasibility Study featuring blocks with a cut-off grade above 0.40 g Au/t. (Graphic: Business Wire)
Figure 4: Cross section (8435450N) of the Batman core zone, illustrating drill holes VB24-033 within the current mineral resource shell from the 2024 Feasibility Study featuring blocks with a cut-off grade above 0.40 g Au/t. (Graphic: Business Wire)
Figure 4: Cross section (8435450N) of the Batman core zone, illustrating drill holes VB24-033 within the current mineral resource shell from the 2024 Feasibility Study featuring blocks with a cut-off grade above 0.40 g Au/t. (Graphic: Business Wire)

DENVER, January 13, 2025--(BUSINESS WIRE)--Vista Gold Corp. (NYSE American and TSX: VGZ) today announced the final drill results for its 2024 drilling program at the Mt Todd gold project. These results further delineate the wider veins with high gold grade intercepts that are consistent with previous drill results in the South Cross Lode (the "SXL").

Drilling Highlights

VB24-032 – Drilled in the SXL and returned multiple mineralized intervals, including

  • 3.0 meters at 4.13 grams of gold per tonne ("g Au/t") from 121.1 meters downhole, including

    • 0.6 meters at 18.34 g Au/t from 123.5 meters downhole

  • 1.1 meters at 16.00 g Au/t from 142.9 meters downhole, including

    • 0.3 meters at 65.42 g Au/t from 142.9 meters downhole

VB24-033 – Drilled in hanging wall structures adjacent to the Batman deposit and returned multiple mineralized intervals, including

  • 43.3 meters at 0.82 g Au/t from 109.0 meters downhole, including

    • 1.0 meters at 7.55 g Au/t from 134.0 meters downhole

VB24-034 – Drilled in the SXL and returned multiple mineralized intervals, including

  • 29.0 meters at 1.55 g Au/t from 156.0 meters downhole, including

    • 1.9 meters at 8.01 g Au/t from 172.1 meters downhole

Frederick H. Earnest, President and CEO, commented, "The holes announced today were an excellent way to finish our drilling in the South Cross Lode. We are most excited about the wider and higher-grade vein intercepts that we continued to encounter at depths beginning just 100 meters below surface. The Company plans to provide an overview of the 2024 drilling program in the coming weeks.

"These and prior drill holes in the South Cross Lode demonstrate the continuity of the mineralization along strike at relatively shallow depths. We expect this to benefit the update to our resource model and the reserve estimates that will be completed in conjunction with the in-progress Mt Todd feasibility study."

Drilling Assessment

The holes reported today concluded Phase 2 of the Company’s 2024 drilling program at the Company’s Mt Todd gold project located in Northern Territory, Australia. These last holes were located to provide specific information to support updating the mineral resource model and to delineate the limits of mineralization in the SXL. Based on these results, we believe that mineralization in the SXL remains open at depth and to the northeast. Hole VB24-033 was drilled to confirm the limits of hanging wall structures adjacent to the Batman deposit.

Holes VB24-031 and VB24-032 demonstrated consistent mineralization from near-surface depths through the end of the holes. Hole VB24-033 was positioned to intercept hanging wall structures to the Batman deposit at greater depths. These three holes were strategically positioned within the 2024 Feasibility Study (as defined below) mineral resources shell. Data from these holes provide a better understanding of the mineralization, structure, and the geological characteristics of the targeted mineralized zones.