ROUYN-NORANDA, Quebec, May 08, 2025 (GLOBE NEWSWIRE) -- Abcourt Mines Inc. (“Abcourt” or the “Corporation”) (TSX Venture: ABI) (OTCQB: ABMBF) is pleased to report new drilling results and an update on its activities at the Sleeping Giant mine.

In 2025, Abcourt completed 36 underground drill holes totaling 5,632 meters. Of these holes, seven target the 785N zone and the underlying areas for a total of 3,316 meters. This 785N zone is in a new sector to the east and at depth of the developed sectors of the mine. After releasing the results of two of these holes earlier this year, Abcourt is today releasing the results of two more holes, 78-888 and 78-890.

The highlights included in this press release are as follows:

  • Hole 78-890 intersected the 785N Zone at the targeted depth (24.3 g/t over 1.9 metres including 41.9 g/t over 0.6 metres);

  • Abcourt will add a third underground drill rig to accelerate its resource conversion drilling program at the upper levels of the mine;

  • Abcourt continues work in anticipation of the closing of previously announced financing which will enable the mine to develop towards production.

Pascal Hamelin, President and CEO, comments: “Since underground drilling began in the fall of 2023, our goal has been to increase the quality and quantity of the mineral resources at Sleeping Giant. This drilling, along with the work accomplished by our Sleeping Giant team, has allowed us to build a solid financial plan for mine development and rapid production ramp-up. Indeed, our surface and underground infrastructure are in very good condition, which will allow us to quickly develop the mine towards a profitable production. Furthermore, we are very excited to see this new promising sector 785N near our underground infrastructure. We believe that we will be able to extend the life of the mine once it is in production.”

The main results of holes 78-888 and 78-890 are displayed in Table 1:

Table 1: Main Underground Drilling Results

DDH

From

To

Intervalle

Au

Vein

(m)

(m)

(m)

(g/t)

78-888

 

13.10

13.60

0.50

59.25

Intervals up the 785N vein.

 

and

87.00

87.80

0.80

10.17

 

and

144.40

145.00

0.60

27.13

 

and

285.40

286.00

0.60

9.24

785N vein

78-890

 

273.50

275.40

1.90

24.30

785N vein

 

Including

274.20

274.80

0.60

41.90

Notes:

1. The length represents the length measured along the drill core.

2. Assay results are not capped, but higher-grade sub-intervals are highlighted.


The main drilling results are illustrated in Figure 1

Figure 1: Main Results – Interception of 785N Zone.

Figure 1: Main Results – Interception of 785N Zone.
Figure 1: Main Results – Interception of 785N Zone.


Drilling data reveal:

  • A concordance between the intervals intersected by drill holes 78-888 and 78-890 and those encountered in nearby previously drilled holes 66-1126-11, 78-885, and 78-886

  • The presence of several mineralized intervals upstream of the 785N Zone. These subparallel mineralized veins are part of the vein system underlying the 785N Zone, as previously mentioned in the February 13, 2025 press release.