Argyle Announces Option to Acquire Clay Howell Rare Earths Project

In This Article:

Calgary, Alberta--(Newsfile Corp. - April 30, 2025) - Argyle Resources Corp. (CSE: ARGL) (OTCQB: ARLYF) (FSE: ME0) ("Argyle" or the "Company") is pleased to announce that it has entered into an option agreement ("Option Agreement") pursuant to which it may acquire a 100% ("Option Arrangement") interest in and to the Clay Howell Rare Earths project ("Project"), subject to a 1.5% net smelter returns royalty ("NSR").

The Project is located in northern Ontario, Canada, roughly 50 km north-northeast of the town of Kapuskasing, and is defined by 10 contiguous mining claims spanning a total of 160ha. The mining claims and patents can be easily accessed by 4×4 pick-up truck using an all-weather access road from Kapuskasing and an abandoned logging road named CSR-8. 2010 and 2011 drilling activities were staged from a camp located at UTM coordinates 4213982E and 5522864N (Zone 17, NAD 83.)

The Clay-Howells Alkalic Rock Complex is comprised of 2 broad types of silica over-saturated syenitic rocks intruding a sequence of Early Precambrian aged paragneisses and orthogneisses that have been regionally metamorphosed to the upper amphibolite - granulite facies typical of the Kapuskasing Sup-Province (Sage, 1988).

Diamond drilling activities were conducted on the Clay-Howells Property from January 16th, 2010 to March 30th, 2010. Norex Drilling Ltd. was contracted to build a camp on the property as well as conduct the drilling operations.

Eighteen drill holes were completed within the carbonatite - magnetite zone to test Niobium - Rare Earth Element mineralization at depth. A total of 5432.5 metres of core was recovered and 1825 samples were collected.

Following the 2010 drill program, an eight-hole diamond drill program program was initiated in early 2011 to test other magnetic anomalies within the 110 km² carbonatite complex. Roughly 2,154 m were drilled and 235 samples were sent for assaying. Several high priority magnetic zones located outside of the main Clay-Howells deposit were tested. Of the 2010 and 2011 drill programs, 6 drill holes, Ch-08, CH-11-03, CH-11-04, CH-11-05, CH-11-06 and CH-11-07 fall within the current Clay Howell Project acquired by Argyle.

Figure 1: Clay Howell REE project and historical drill hole location map

To view an enhanced version of this graphic, please visit:
https:/https://finance.yahoo.com/images.newsfilecorp.com/files/10451/250253_d840be31f4514a41_002full.jpg

Under the terms of the Option Agreement, the Company may acquire the Project, subject to the NSR, by making the following cash and share payments to the vendors ("Vendors"):