Collective Mining Expands the Initial High-Grade Sub-Zone at Apollo by Intersecting 114.50 Metres at 5.00 g/t AuEq Within 263.85 Metres at 3.10 g/t AuEq

In This Article:

  • Drill hole APC104-D6 extended the first high-grade sub-zone drill tested by the Company to date by up to 70 metres vertically by intersecting 114.50 metres @ 5.00 g/t gold equivalent within 263.85 metres at 3.10 g/t gold equivalent. Hole APC104-D6 was drilled below previously announced holes APC104-D2 and APC104-D5, which intercepted 181.35 metres @ 5.38 g/t AuEq** and 106.35 metres at 9.05 g/t AuEq**, respectively.

  • Drill hole APC104-D7A clipped the eastern edge of the same sub-zone, intercepting 30.25 metres @ 5.10 g/t gold equivalent within 137.70 metres @ 2.94 g/t gold equivalent. Results to date from the new orthogonal drilling program into the first high grade sub-zone have now outlined dimensions of 180 metres of strike, 70 metres in thickness and over 70 metres vertical and is still open in most directions for future expansion.

  • The Company has modeled eleven high-grade sub-zones target areas within the top 1,000 vertical metres of Apollo and plans to drill test each of them over the course of 2025. The high-grade sub-zones have the potential to boost the overall grade and mineral inventory of the Apollo system within the existing block model.

  • Mother hole APC-106D was drilled outside the Apollo system to the north and intersected multiple, shallow and high-grade gold-silver veins with results including 1.65 metres @ 20.81 g/t gold equivalent and 1.90 metres @ 16.29 g/t gold equivalent. Drilling of the Northern Gold-Silver Vein Zone to the north of Apollo has now outlined a 350-metre-long zone of high-grade porphyry related veins ("CBM veins").

TORONTO, April 15, 2025 /CNW/ - Collective Mining Ltd. (NYSE: CNL) (TSX: CNL) ("Collective" or the "Company") is pleased to announce assay results for three holes drilled into the Apollo system ("Apollo"). Two of the holes were designed to test the potential extension of the recently discovered first high-grade sub-zone, while the third hole was drilled into the early-stage Northern Gold-Silver Vein Zone located above and to the north of the brecciated Apollo system. Apollo is the most advanced discovery made to date within the Company's multi-target Guayabales Project in Caldas, Colombia.

The Company currently has eight drill rigs operating as part of its fully funded 70,000-metre drill program for 2025 with five rigs drilling at Apollo, one at the Tower target and two rigs at the San Antonio Project.

The 2025 objectives for the portion of the drilling program targeting the Apollo system are:

  • Drill test newly modeled high-grade sub-zone targets scattered throughout the top 1,000 vertical metres from surface to improve the grade profile (and size) of the system.

  • Grow the overall dimensions of the system by expanding vertically and laterally the recently discovered high-grade Ramp Zone.

  • Test the northern extension potential of Apollo at shallower elevations.

  • Expand and define the area of outcropping/shallow mineralization and test many drilling gaps within the internal block model from surface to a depth of 150 metres.