LIFT Intersects 28 m at 0.99% Li2O at its BIG East pegmatite, Yellowknife Lithium Project, NWT

In This Article:

Li-FT Power Ltd.
Li-FT Power Ltd.

Figure 1

Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.
Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.

Figure 2

Plan view showing the surface expression of the BIG East pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the BIG East pegmatite with diamond drill holes reported in this press release.

Figure 3

Cross-section illustrating YLP-0115 with results as shown in the BIG East pegmatite dyke with a 28 m interval of 0.99% Li2O.
Cross-section illustrating YLP-0115 with results as shown in the BIG East pegmatite dyke with a 28 m interval of 0.99% Li2O.

Figure 4

Plan view showing the surface expression of the Echo pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Echo pegmatite with diamond drill holes reported in this press release.

Figure 5

Cross-section of YLP-0120 which intersected the Echo pegmatite dyke with a 23 m interval of 0.61% Li2O.
Cross-section of YLP-0120 which intersected the Echo pegmatite dyke with a 23 m interval of 0.61% Li2O.

Figure 6

Plan view showing the surface expression of the Shorty pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Shorty pegmatite with diamond drill holes reported in this press release.

Figure 7

Cross-section of YLP-0111 which intersected the Shorty pegmatite dyke with a 11 m interval of 0.52% Li2O.
Cross-section of YLP-0111 which intersected the Shorty pegmatite dyke with a 11 m interval of 0.52% Li2O.

Figure 8

Plan view showing the surface expression of the Ki pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Ki pegmatite with diamond drill holes reported in this press release.

Figure 9

Plan view showing the surface expression of the Fi Main pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Fi Main pegmatite with diamond drill holes reported in this press release.

Figure 10

Plan view showing the surface expression of the Fi SW pegmatite with diamond drill holes reported in this press release.
Plan view showing the surface expression of the Fi SW pegmatite with diamond drill holes reported in this press release.

VANCOUVER, British Columbia, Dec. 27, 2023 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to report assays from 8 drill holes completed at the BIG East, Echo, Fi Main, Ki, & Shorty pegmatites within the Yellowknife Lithium Project (“YLP”) located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling has intersected significant intervals of spodumene mineralization, with the following highlights:

Highlights:

  • YLP-0115: 28 m at 0.99% Li2O, (BIG East)
    including: 8 m at 1.43% Li2O

  • YLP-0120: 23 m at 0.61% Li2O, (Echo)
    including: 6 m at 1.06% Li2O

  • YLP-0111: 11 m at 0.52% Li2O, (Shorty)
    including: 2 m at 1.24% Li2O

  • YLP-0124: 6 m at 1.07% Li2O, (BIG East)

Discussion of Results
This week’s drill results are for eight holes drilled on five different pegmatite complexes, with two holes each from BIG East (YLP-0115, -0123), Shorty (YLP-0070, -0111), and Fi Main (YLP-0071, -0137) as well as one hole each from Echo (YLP-00120) and Ki (YLP-0118). A table of composite calculations, general comments related to this discussion, and a table of collar headers are provided towards the end of this section.

Figure. 1_Location of LIFTs Yellowknife Lithium Project
Figure. 1_Location of LIFTs Yellowknife Lithium Project


Figure 1 – Location of LIFT’s Yellowknife Lithium Project. Drilling has been thus far focused on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.

BIG East Pegmatite
The BIG East pegmatite complex comprises a corridor of parallel-trending dykes that is exposed for at least 1,300 m of strike length, ranges from 10-100 m wide, and dips approximately 55°-75° degrees to the west. The northern-most ~300-400 m of this corridor is stepped over 300 m to the west to form an en échelon-like array with the southern bulk of the complex.

YLP-0115 was drilled to test the BIG East swarm approximately 600 m from its southern end and 200 m vertically beneath the surface, as well as 50 m downdip of previously released YLP-0092 (combined 25 m of pegmatite averaging 1.73% Li2O), 150 m downdip of YLP-0085 (combined 28 m at 1.19% Li2O), and 200 m downdip of YLP-0084 (combined 20 m at 1.44% Li2O). Drilling intersected a single 31 m wide pegmatite dyke that returned an assay composite of 0.99% Li2O over 28 m, including a subinterval of 1.43% Li2O over 8 m.

YLP-0123 was drilled on northern en-échelon step-out, approximately 100 m from its northern mapped extent, 50 m vertically beneath the surface, and 50-100 m up-dip of previously released YLP-0122 (no pegmatite). Drilling intersected a 9 m wide and 8 m wide pegmatite separated by 17 m of country rock, with the upper one returning a composite of 1.07% Li2O over 6 m (Table 1 and 2, Figures 2 & 3).