PTX Metals Drilling at Heenan-Mallard Gold Project Confirms Expansion of Newly Discovered Gold System

In This Article:

Toronto, Ontario--(Newsfile Corp. - April 14, 2025) - PTX Metals Inc. (TSXV: PTX) (OTCQB: PANXF) (FSE: 9PX) ("PTX" or the "Company"), is pleased to announce results from the second phase drill program at the Heenan-Mallard Gold Property located in the Swayze Greenstone Belt and 45 km northwest of the IAMGOLD's Cote Gold Mine. As a follow-up from the initial green field discovery that consisted of a limited stripping and initial four-hole drill program (see news release dated of February 21st, 2024), PTX completed an additional five drill holes aiming to test continuity of the mineralization along strike and at depth. All of drill holes intersected near-surface gold mineralization with a highlight of 75.75m at 0.50g/t Au including 5.00m at 3.93 g/t gold being intersected in drill hole HE24-06.

The recent drilling has shown sizeable intercepts in most of the drill holes, confirming expansion of a newly discovered system near IAMGOLD's Cote Gold mine, and suggesting prospectivity for near-surface mineralized tonnage considering multiple mineralized intervals above 70m wide in core length in two drill holes. Considering step out holes, drilling has successfully intercepted new gold mineralization opening up for expanding the mineralization along strike and at depth. The bulk of the mineralization sits within the iron formation hosting a high density of felsic dikes, for which lithological contacts and structural breaks provide favorable conduits for mineral deposition. The gold mineralization has been described as being associated with pyrite and minor quartz veining.

Additionally, the Company has submitted exploration permits on its Shining Tree Property where a drill program is being planned to test the high-grade Ribble Vein at Ronda where a mechanized stripping and channel sampling program completed by PTX returned multiple channels of high-grade gold mineralization with 16.14m at 9.04g/t Au being reported in channel sampling (see press release dated of February 7th, 2024).

Results highlights of the second phase drill program at Heenan:

  • The program consisted of 5 diamond drill holes totaling 693.35 m.

  • Combined drilling Phase 1 and 2 cumulates 1,305m for 9 holes.

  • Drill holes tested the down dip extension in three areas and along strike in two areas from the initial discovery made in 2024.

  • Mineralized system remains open along strike and at depth for potential expansion

    • SECTION A: Following up the initial interception of 77.44m at 0.40 g/t Au from 2024 drill program, the hole HE24-05 is spaced 50m deeper and is demonstrating multiple intercepts such as 5.0m at 0.84g/t Au or 3.0m at 0.82 g/t Au, occurring mostly at lithological contacts.

    • SECTION B: Similarly to section A, considering approximately a 30m distance between both HE23-03 and HE24-06, a wider zone of 75.75m at 0.50g/t Au was intercepted below the 2024 results of 27.15m at 0.55 g/t Au (see figure 1 below).