Q2 Metals Drills 188.6 M Grading 1.56% Li2O, including 26 Metres of 2.03% Li2O, at the Cisco Lithium Property, James Bay, Quebec, Canada

In This Article:

Q2 Metals Corp. (TSX.V:QTWO)(OTCQB:QUEXF)(FSE:458) ("Q2" or the "Company") is pleased to report further assay results from the 2024 drill campaign at the Cisco Lithium Property (the "Property" or the "Cisco Property") located within the greater Nemaska traditional territory of the Eeyou Istchee James Bay region of Quebec, Canada. All drill holes intersected pegmatite with visual indications of spodumene mineralization identified.

"The results of drill hole 23 successfully confirmed the continuity of spodumene mineralization over the 850-metre strike length and, combined with drill hole 22, which underscores the down-dip continuity between holes 13, 17, 18 and 22, reinforces our confidence in the scale of Cisco, " said Neil McCallum, Q2 Metals Vice President of Exploration." Significantly more upside potential exists, and we plan to continue growing the already very large system to both the south and the east in our upcoming winter exploration program."

A total of 6,359.7 metres ("m") was drilled over 17 drill holes during the 2024 drill campaign at the Cisco Property. Analytic results for drill hole CS-24-020 remain to be reported.

The analytical results reported herein represent 1,188.1 m of drilling over two (2) holes during the 2024 drill campaign. Complete highlighted intervals from drill holes CS-24-022 and 023 are summarized in Table 1 and represented in Figure 1 and 2.

Drill hole CS-24-022 was collared 200 m behind and on the same line as drill hole CS-24-018 to test the continuity of the mineralized system to the southeast. Drill hole CS-24-018 was the first hole with analytic results that confirmed the large, mineralized zone to the south with a 215.6 m interval grading 1.69% Li 2 O, including 64.6 m at 2.29% Li 2 O.

A total of 10 individual spodumene pegmatite intervals were encountered in drill hole CS24-022 with:

  • Seven (7) intervals greater than 10 m wide, and

  • Four (4) of those intervals greater than 40 m wide.

Drill hole CS-24-022 successfully confirmed the continuity of the mineralized system to the southeast with three separate intervals grading at or over 1.55% Li 2 O (see Figure 2).

Figure 1. Map of Recent Drill Holes with Analytical Results at Cisco Property

Drill hole CS-24-023 was collared in the same location as drill hole CS24-020 to test the continuity of the main large continuous pegmatite zone encountered in drill holes CS-24-010, 018 and 021 to the south.

Drill hole CS-24-023 encountered 12 individual spodumene pegmatite intervals with: