Sirios obtains up to 40.7 g/t Au over 1.0 m in the last two holes of 2024 and resumes drilling at Cheechoo

In This Article:

Sirios Resources Inc.
Sirios Resources Inc.

MONTRÉAL, Jan. 15, 2025 (GLOBE NEWSWIRE) -- Sirios Resources Inc. (TSX-V: SOI; OTCQB: SIREF) (“Sirios” or the “Company”) is pleased to announce the results of the last two drill holes from Phase 1 of its Fall–Winter 2024–25 drilling program targeting depth extensions of gold mineralization at the Cheechoo project in Eeyou Istchee James Bay, Quebec. As with the first two drill holes of the program (ref.: press release 12/16/2024), gold mineralization was intercepted in holes #319 and #320 at the locations anticipated by Sirios' geological team. Following these results, drilling resumed this week including, in addition to new holes, the deepening of drill holes #317 and #319 by 100 m and 50 m, respectively.

MAIN RESULTS FROM DRILL HOLES 319 AND 320

DDH CH24-

From (m)

To (m)

Au (g/t)

Length (m)

319
EOH** : 402.0m

33.0

46.0

1.69

13.0

Incl. 36.8

39.8

6.26

3.0

Incl. 38.8

39.8

*14.94

1.0

219.1

233.5

0.76

14.4

248.0

252.4

2.88

4.4

Incl. 249.7

251.0

*8.81

1.3

364.8

375.0

0.89

10.2

378.9

395.4

2.16

16.5

Incl. 390.9

393.9

9.84

3.0

Incl. 392.9

393.9

*26.41

1.0

320
EOH: 683.5m

232.5

266.6

0.72

34.1

371.5

389.6

1.81

18.1

Incl. 382.7

383.7

*20.93

1.0

406.5

441.8

1.03

35.3

Incl. 415.1

416.1

*19.78

1.0

501.7

504.0

3.65

2.3

 

552.9

558.6

7.46

5.7

 

Incl. 554

555.0

*40.70

1.0

 

597.5

628.0

0.69

30.5

 

665.0

683.5

0.55

18.5

Interval lengths are measured along the holes and do not necessarily equate to true thickness.
*Visible Gold. ** EOH : End Of Hole.

Dominique Doucet, President and CEO of Sirios Resources, stated: “We are very pleased with the assay results from this first phase and to resume drilling. As expected, all four drill holes intersected high-grade gold at depths below the conceptual pit used to delineate current resources. The results continue to increase our confidence in the distribution of gold grade, both in the enriched zones at depth and in the lower-grade halo. We are confident that the drilling from recent weeks, as well as the drilling we are about to carry out, will create additional value for the Cheechoo project by adding underground mining potential, which has never been evaluated until now, to the open-pit potential.”

Location of drill holes CH24-317 to CH24-320.
Location of drill holes CH24-317 to CH24-320.


Figure 1: Location of drill holes CH24-317 to CH24-320.

Phase 1 of the Fall–Winter 2024–25 Drilling

Holes #319 and #320 completed phase 1 of the Fall-Winter 2024-25 program for a total of 1,882 meters. The deepening of drill hole #317 is ongoing, to be followed by the drilling of phase 2 targets as well as the deepening of #319.

Strategic Objectives

The primary objectives of this drill program are to:

  1. Gather data to support an upcoming Mineral Resource Estimate (MRE) update;

  2. Test high-priority targets identified during the comprehensive data review conducted by Sirios during the summer of 2024.