Spanish Mountain Gold Reports Near Surface High Grade Gold Intercepts in the K - Zone

In This Article:

Figure 1 – Plan View, K-Zone - 2025 Winter Drill Program
Figure 1 – Plan View, K-Zone - 2025 Winter Drill Program
Figure 2 – Long Section showing the K-Zone.
Figure 2 – Long Section showing the K-Zone.
Figure 3 – Representative specimens of the visible gold VG found in the K-Zone Target. Inset A and a. 25-DH-1286 Drill core photo of quartz + VG vein hosted in sericite-altered tuff. Inset B. 25-DH-1285 Drill core photo of quartz + VG hosted in mafic tuff.
Figure 3 – Representative specimens of the visible gold VG found in the K-Zone Target. Inset A and a. 25-DH-1286 Drill core photo of quartz + VG vein hosted in sericite-altered tuff. Inset B. 25-DH-1285 Drill core photo of quartz + VG hosted in mafic tuff.

VANCOUVER, British Columbia, April 24, 2025--(BUSINESS WIRE)--Spanish Mountain Gold Ltd. (the "Company" or "Spanish Mountain Gold") (TSX-V: SPA) (FSE: S3Y) (OTCQB: SPAUF) is pleased to report high grade gold intercepts and the highest grade encountered to date in exploration history at the Spanish Mountain Gold project, which is located in the Cariboo Gold Corridor, British Columbia, Canada. The 10,000 m, 2025 winter exploration diamond drill program ("2025 Winter Drill Program") is comprised of 31 holes and 73% complete.

Highlights:

High-Grade Gold Intercepts – K Zone (See Figures 1, 2, and Table 1):

  • Hole 25-DH-1286 intersected 139.00 m grading 4.18 g/t Au from 56.00 m including, from 163.00 m, grades of 719.26 g/t Au over 0.75 m, and from 165.10 m, 156.80 g/t Au over 3.50 m

  • Hole 25-DH-1284 intersected 55.70 m grading 0.41 g/t Au from 126.00 m including, from 172.00 m, 9.70 m grading 1.83 g/t Au and 1.00 m grading 12.13 g/t Au

  • Hole 25-DH-1285 intersected 39.00 m grading 0.99 g/t Au from 113.00 m including 1.00 m grading 34.59 g/t Au

Visible gold (VG) was observed in multiple drill holes, confirming the high-grade nature of the K Zone Target (See Figure 3)

Julian Manco, Spanish Mountain Gold's Director of Exploration commented, "These exceptional results validate our new geological model, extend mineralization and highlight the significant potential for more high-grade mineralization within our project area. The high grades encountered in hole 25-DH-1286 are truly remarkable and demonstrate an extraordinary upside potential for the Spanish Mountain Gold project."

Peter Mah, Spanish Mountain Gold's President, CEO and Director commented, "We are thrilled to take a major leap forward unlocking near surface high-grade gold intercepts that support the growing understanding of our high-quality deposit and signal exciting new possibilities for high grade open pit gold discovery within 200 m of surface"

Table 1: 2025 Winter Drill Program – Summarized Gold Assay Results

Drillhole ID

From

To

Width(m)

Gold Grade (g/t Au)

25-DH-1284

126.00

181.70

55.70

0.41

25-DH-1284

172.00

181.70

9.70

1.83

including

172.00

173.00

1.00

12.13

including

180.20

181.70

1.50

3.23

25-DH-1285

113.00

152.00

39.00

0.99

including

113.00

114.00

1.00

34.59

25-DH-1285

173.35

174.74

1.39

1.02

25-DH-1286

56.00

195.00

139.00

4.18

including

163.00

166.50

3.50

156.28

including

165.10

166.50

0.75

719.26

25-DH-1287

68.00

97.00

29.00

0.26

including

75.00

78.00

3.00

0.24

including

94.00

97.00

3.00

1.64

Notes:

  1. Reported intersections are calculated using a 0.15 g/t Au cut-off grade.

  2. The complete assay table is available on the Company’s website

  3. True thickness of mineralization is unknown