WALKER RIVER ANNOUNCES INTERCEPTS INCLUDING 2.62 G/T OVER 41.1 METERS AT THE LAPON GOLD PROJECT

In This Article:

Walker River Resources
Walker River Resources

Vancouver, B.C., March 27, 2025 (GLOBE NEWSWIRE) -- Walker River Resources Corp. (“Walker” or the “Company”) (TSX-V: WRR) is pleased to announce additional assay results from the 2024 reverse circulation (“RC”) drill program at the Lapon Canyon portion of the Lapon Gold Project, located within the Walker Lane Gold trend, 60 km SE of Yerington, NV.

Highlights 

Drill Hole

From (m)

To (m)

Width* (m)

Gold (g/t)

LC-24-122

21.3

24.4

3.1

1.16

51.8

93.0

41.1

2.62

incl

56.4

64.0

7.6

6.81

and

86.9

88.4

1.5

9.33

LC-24-120

64.0

74.7

10.7

1.11

incl

71.6

73.2

1.5

5.47

Table 1. Highlighted holes released today. * Denotes the above drill results are presented with lengths representing sampled lengths. True width is estimated to be between 80 and 95 percent of sampled widths. 

  • Drill hole LC-24-122 returned 2.62 g/t Au over 41.1 meters starting at a depth of 51.8 meters including an intercept of 6.81 g/t Au over 7.6 meters, demonstrating the robust nature and consistency of the gold mineralization at the Hotspot zone.

  • Drill holes LC-24-120 and LC-24-121 did not reach the presumed position of the Hotspot zone, due to drill set up problems that forced drilling to be carried out at shallow angles. Notably and unexpectedly, in LC-24-120, gold mineralization was discovered in the overlying granite returning 1.11 g/t Au over 10.7 meters at a depth of 64.0 meters. The bottom of the hole returned 0.53 g/t Au over 24.4 meters signifying the presumed proximity to the Hotspot zone lurking just below. LC-24-121 also returned gold mineralization at the end of the hole, including 0.62 g/t Au in the last 1.5 meters.

  • The 2024 drill programs at Lapon Canyon were exploration and definition focused. Drill holes were planned with the intent to define the extent and geometry of the mineralized system and test for new mineralized zones along strike and at depth.

  • Drilling at Lapon Canyon is carried out in different directions (azimuths) from the same drill pad, for systematic drilling on section, drill pads are placed at every 30 to 60 meters, with up to five holes per pad.

  • Previous and current drilling continue to define a sub to horizontal geometry of the gold system. High grade shoots may have developed within the broader mineralized domains.

  • Drillholes LC-24-123, 124, 125 were all drilled from the same drill pad located at the juncture of the uppermost drill access road. This is located within fresh granite (the top of these holes are mineralized) over 100 meters north of the interpreted projection of the Hotspot zone. Drilling was carried out here to gain geological bedrock knowledge, drillhole LC-24-123 returned no significant results. However, significant gold mineralization was encountered in LC-24-124 and LC-24-125. LC-24-124 returned 0.37 g/t Au over 7.6 m starting at 0 m and 1.91 g/t Au over 6.1 meters starting at 117.4 meters. LC-24-125 returned 0.41 g/t Au over 7.6 meters starting at 0 m and 0.56 g/t Au over 4.6 meters starting at 94.5 meters.